Image
PROMO 660 x 440 Construction - Track Hoe - Wikimedia

CDOT Construction News

US 287 Northbound / Southbound in Eads (Milemarker 99-120) (through September 2016)

24 Hours- SU-SA Su-Mo 24 hr. southbound lane closure US 287 east of Eads (milepost 110-109); Su-Mo 24 hr. northbound lane closures north of Eads (mp 119-120); Tu-Fr 24 hr. northbound lane closures between Eads and Wiley (mp 99-100) and north of Eads (mp 119-120);

Sa 24 hr northbound lane closures east of Eads, south of Hwy. 96 (mp 107-108) and north of Eads (mp 116-117). Speeds reduced; Project Info: 719-593-9239.

 

ROAD MAINTENANCE OPERATIONS http://i.cotrip.org/images/alert/alert_roadwork_minimal_16x16.png?v=00492

US 287 Northbound / Southbound at 10th Ave. and Lamar (Milemarker 296.8-299) (through November 2016)

8:30 AM-4:00 PM MO-FR north and southbound right turn pocket on westbound 10th closed; single right lane closure at Lamar for infrastructure/boring

 

PAVING OPERATIONS http://i.cotrip.org/images/alert/alert_roadwork_minimal_16x16.png?v=00492

CO 96 Eastbound / Westbound Haswell, Kiowa County (Milemarker 130.59-166)(through September 2016)

6:00 AM-8:00 PM MO-FR east and westbound rolling single lane closures for milling, paving and striping between milepost 130.59 to 166. The project posted speed is 40 mph in the work zone. Expect 15 min delays. 14 foot width restriction in place during project work hours. PIO: 719-480-9890.

 

ROAD CONSTRUCTION http://i.cotrip.org/images/alert/alert_roadwork_moderate_16x16.png?v=00492

US 350 Eastbound / Westbound US 350A in Otero and Las Animas counties (Milemarker 33-47) (through November 2016)

6:00 AM-8:00 PM MO-FR Eastbound and westbound US 350 will have moving single lane closures throughout the project for bridge work and shouldering. Project posted speed is 40 mph; expect 15-minute delays; 14-foot width restriction during project hours; Project Info: 719-600-1345 email jlopez@ape.us.com.